Estimate how long a battery bank can run a load through an inverter, IPS or UPS. Works for lead-acid and lithium (LiFePO4) batteries.
Formula
Backup time (h) = Ah × V × number of batteries × usable fraction × efficiency / load (W)
Design notes
- Lead-acid capacity drops at high discharge rates (Peukert effect). Rated Ah is usually at the 20-hour rate, so heavy loads give less runtime than this estimate.
- Discharging lead-acid batteries below 50% regularly shortens their life considerably.
- Battery capacity falls with age and at low temperature; size with 20–30% margin.
- Inverter idle consumption also drains the battery when the load is small.
More calculators
- PCB Trace Width Calculator (IPC-2221)
- Voltage Divider and ADC Scaling Calculator
- LED Series Resistor Calculator
- CT Burden Resistor Calculator for Microcontroller ADC
- Ohm’s Law and Power Calculator
- Resistor Colour Code Calculator (4 and 5 Band)
- 555 Timer Astable Calculator
- RC Time Constant and Cut-off Frequency Calculator
- IPS / Inverter Size and Battery Calculator for Home
- Electricity Unit (kWh) and Bill Calculator
- Solar Home System Size Calculator (Panels, Battery, Controller)
- SMD Resistor Code Calculator (3-Digit, 4-Digit and EIA-96)
- Capacitor Code Calculator (104, 103, 222 to nF and µF)
- Series and Parallel Resistor and Capacitor Calculator
- Wire Size and Voltage Drop Calculator (mm² Cable)
- LM317 Voltage Regulator Calculator (R1, R2 and Output Voltage)
- Buck Converter Calculator (Duty Cycle, Inductor and Capacitor)
- Battery Charging Time Calculator (Lead-Acid, Li-ion, LiFePO4)
- Li-ion / LiFePO4 Battery Pack Calculator (Series and Parallel Cells)
- Op-Amp Gain Calculator (Inverting and Non-Inverting)
- kVA, kW and Amps Calculator (Single-Phase and Three-Phase)
Need this designed for your product? We design power electronics, embedded firmware and industrial IoT hardware. Message us on WhatsApp or use the contact form.